摘 要
施工组织设计是以整个建设项目为对象,根据初步设计或扩大设计图纸以及其他有关资料和现场施工条件编制,用以指导全工地各项施工准备和施工活动的技术经济文件。
随着经济社会的发展,科学、合理的施工组织设计对于建筑工程活动的作用越来越大。一份合理、科学的施工组织设计关系着整个工程的质量、进度、经济效益等,因此施工组织设计要合理的运用人力、物力、财力等资源并结合工程实际情况和社会现实,以承包合同和设计图纸以及国家相关法律法规为依据,在保证质量和安全的前提下,秉承技术先进、经济合理的原则,使建筑施工活动全过程能够科学化、系统化、规范化,达到工程要求,使各方都能获得最大的利益。
本施工组织设计是对长安区航天城廉租住房土建项目施工组织的设计,该设计的编制依据招标文件、设计图纸、各种规范、国家政策及当地法规等。其编制包括:工程概况和特点分析;施工部署和主要工程项目施工方案;施工进度计划;施工资源需求量;施工总平面图;各种施工保证措施等。
关键词:施工组织设计;进度计划;科学规划
Abstract
Construction design is based on the entire construction project for the object, based on preliminary design or expand design drawings and other relevant information and conditions for the preparation of the construction site to guide the whole of the construction site preparation and construction activities of the technical and economic documents.
With the economic and social development, scientific and reasonable construction design for the role of construction engineering activities is growing. A rational, scientific construction design related to the whole project quality, progress and economic benefits, so the construction organization design to rational use of human, material, financial and other resources combined with practical engineering and social realities and to contract design drawings and relevant national laws and regulations as the basis, to ensure the quality and safety of the premise of adhering to the advanced technology, economic rationality, so that the entire process of construction can be scientific, systematic, standardized, to engineering requirements, the parties You can get the maximum benefit.
The construction design is beautiful in Chang’an District Civil SkyCity low-cost housing projects organization design, preparation of tender documents based on this design, design drawings, norms, national policies and local regulations. Its preparation includes: Project Overview and characteristics analysis; construction and deployment of major projects construction program; the construction schedule; the demand for construction resources; master plan construction; various construction assurance measures.
Keywords: construction design; scheduling; scientific planning
目 录
2.3.1 单位工程招标控制价汇总表……………………….. 7
2.3.3 措施项目清单与计价表………………………….. 14
3.3.1 基础及主体工程施工方案依据…………………….. 17
3.3.2 本工程施工过程的划分………………………….. 17
3.4 施工组织机构和施工人员配备………………………….. 18
3.4.1 管理机构及质量、安全保证体系…………………… 18
3.4.2 项目部主要施工及管理人员………………………. 19
3.5 进入该工程的施工机械设备……………………………. 19
3.6.2 临时生活设施 ……………………………….. 20
3.6.4 施工临时供水供电线路 ………………………… 21
3.7 施工进度计划及保证工期措施………………………….. 21
3.7.1 施工进度计划 ……………………………….. 21
3.8 总体施工顺序和主要工艺流程………………………….. 22
3.8.1 工程总施工顺序安排……………………………. 22
3.9.5 基础施工及土方回填……………………………. 24
3.10.1 保证工程质量措施…………………………….. 27
3.11 安全生产保证措施………………………………….. 28